Call us : 01562 881420 | Email Us : enquiries@cdcltd.co.uk

Latest Newsletter Now Available | Sign Up for our newsletter



Latest News

High Precision

http://cleanroomdesign.co.uk/uploads/images/case-studies/elec-3.jpg
http://cleanroomdesign.co.uk/uploads/images/case-studies/elec-4.jpg

Project Type :

Size : 140m2

Duration : 16weeks

Cost : £200,00

Details :

  • Principle Contractor √
  • Design & Build √
  • Live Site √
  • Contract Type JCT √
  • Project Planning √
  • Project Management √
  • Construction & Fit-out √
  • HVAC & Ventilation √
  • Piped Services √
  • Electrics √
  • Test & Commission √
  • Validation √

Project Description: Secured through competitive tender CDC were selected as preferred contractor of choice by this market leading provider of award winning bond test and x-ray inspection systems for electronic components.

Working within the confines of a congested ‘live site’ CDC took complete responsibility for the project delivery by acting as both Designer and Principle Contractor under CDM. Through careful coordination and close alliance with the client team the works were programmed to minimise impact to the general site operations.

By carefully specifying and selecting the room fabric envelope to minimise static build up, the floors were treated with a high-build polyurethance resin antistatic flooring to EN IEC 61340 offering electrical resistance of 5x104 – 1x109 ohms. Environmental control to the  critical areas of the facility had services designed for ‘close control’ environmental conditions with ±1°c temperature control at measuring point together with RH control of ≤60% and 1000lux lighting levels for application inspection.

 

 

Case Studies

To read more about our recent case studies, please click below.

Contact Us

Need help? Or want to speak to someone? Click the link below to be taken to the contact page.

After sales & Support

We have a lot to offer in terms of support, for more information please click below.


Twitter Feed

Call Us now on
01562 881420