Queens Hospital Burton on Trent chose CDC Cleanroom Specialists as sole contractors to refurbish existing cleanrooms and QC laboratory. This is to provide a new suite of cleanrooms to enable Burton to become a lead manufacturing unit for non-sterile products and support unit for sterile products.
Data
Industry Sector: NHS Pharmacy
Cleanroom Classification: Class 10,000/100,000 Grade C/D Value: £810,000 Time on Site: 46 weeks Physical Size: 330m2
Scope of Work
CDC Cleanroom Specialists were employed as principal contractor and designer for Phase.2 of the project which required the interfacing of new build and existing facilities to produce an integrated Pharmacy manufacturing, testing and dispensing unit with minimal disruption to the busy hospital Pharmacy Department. The project incorporated:
• Partitioning • Ceiling and vinyl floor • Strip-out and builder’s work • Air conditioning plant • Automatic controls • Electrical and lighting • Mechanical pipework and ductwork • Commissioning and Validation • Cleandown and special gases
Client Comments
‘CDC proved to be an excellent choice as specialist contractor for our project. From tendering stage, through design, build and validation they were very professional and exercised great care and attention to detail. They were open and honest, and we were able to raise issues before there were problems so that we were able to resolve them to mutual satisfaction. In CDC we had partners who were helping us to achieve the best possible outcome rather than adversarial ‘build as plan and let the problems build-up for post contract negotiations’ that we know others have suffered elsewhere.’